The best time to stop termites is before the building exists. Pre-construction anti-termite treatment applies termiticide to the soil at key stages of construction, creating a treated zone between the ground and your structure.
We work with builders, contractors and home owners across Madhya Pradesh, and schedule visits around your construction timeline so each stage is treated at the right moment.
Stages we treat
- Foundation pits and trenches, before the foundation is laid
- Backfill soil around foundations and walls
- Plinth area, before the floor is laid
- Junction of walls and floor
- Soil along external walls and around pipes and conduits
Our pre-construction anti-termite treatment process
- Site visit and schedule aligned with your construction plan
- Chemical treatment of soil at each stage, at the required dosage
- Record of each treatment visit for the owner or builder
- Post-construction advice and optional periodic inspection
For builders and contractors
We handle residential colonies, apartments, schools, hospitals, warehouses and industrial sheds. Share your drawings and timeline, and we will prepare a stage-wise treatment plan and quotation.
Frequently asked questions
When should pre-construction treatment be done?
Treatment starts at the foundation stage and continues through backfilling and plinth, before the floor is laid. Call us before excavation is complete so we can plan the visits.
Is pre-construction treatment better than post-construction?
It is generally more thorough, because the soil under the whole building can be treated evenly. Post-construction treatment is the option for existing buildings.